How long does a kitchen renovation take?

From first design to a finished kitchen, stage by stage, and the days you're without one.

Free, no obligation. One kitchen company near you prices it, not five.

The short answer. Four to eight weeks from first design to a finished kitchen. The fitting is three to seven days on site, and the whole job with tiling, plumbing and electrics two to three weeks.

Our price guide

JobTypical priceWhat moves the price
Fitting only, you supply the kitchen€2,000 to €6,000The size, and whether plumbing, electrics and tiling are in it.
Respray, small kitchen (up to 10 doors)€700 to €1,995About a day on site. Solid wood, painted wood and sound MDF take it well.
Quartz worktop, standard 6 m kitchen, fittedFrom €2,200€450 to €1,200 a metre fitted. Granite from €2,500.

Typical prices for Irish homes. Your written quote comes after the room is measured.

Every stage, timed

  • Design and ordering: one to two weeks.
  • Making the units: two to six weeks; bespoke takes four to six weeks of workshop time.
  • Fitting: three to seven days.
  • Stone worktop: templated after the units go in, fitted a week or two later.
  • Tiling, plumbing, electrics: the job runs to two to three weeks on site.

A made-to-measure kitchen is usually fitted within about 12 weeks of signing off the design. A respray takes one to five days.

How long you're without a kitchen

About a week for the old one out and the new one in, a little longer with stone. Set up a kettle and a microwave in another room.

What slows it down

  • Changing the design after it's ordered.
  • Moving the sink, cooker or a wall: the plumber, electrician or builder comes first.
  • The run-up to Christmas.
Green shaker kitchen with a painted island and brass handles
Free design Studio
See your own kitchen redesigned first

Take a photo, pick a style, colour and worktop, and our free Studio draws it on your room.

Design my kitchen, free

Questions people ask

How long does a kitchen renovation take in Ireland?

Four to eight weeks from design to finished, with three to seven days of fitting on site.

How long will I be without a kitchen?

About a week, a little longer with a stone worktop.

Kitchen renovation by county

More kitchen guides

Example preview made with our design Studio.

Free kitchen design Studio

See your own kitchen redesigned, free

Take a photo, pick the doors, colour and worktop, and our Studio draws it on your room. Then talk to the designer to change anything until it's right.

Get a free price for your new kitchen

Design it on your own photo first. Then one kitchen company near you measures up and quotes. Not a list.